Displaying 731 - 740 of 1670 Search Results
Renewable Market Adjusting Tariff (Re-MAT)
for Small Renewable Generation
Re-MAT Program Summary
SDG&E’s ReMAT offers power purchase agreements to distribution-level renewable projects sized at 3 MWs or less from three product categories: baseload (typically including geothermal, bioenergy and hydro), peaking (typically including solar) and non-peaking (typically including wind). ReMAT was established by CPUC Decisions (D.) 12-05-035 and (D.) 13-05-034 to implement Senate Bill (SB) 32. SDG&E’s ReMAT was closed by the California Public Utilities Commission (“Commission” or “CPUC”) on December 15, 2016 and ordered re-opened in D.21-12-032 to procure 20.9 MW (the “Program Cap”), split equally among the three product types.
Eligibility
The program rules are described in more detail in the Re-MAT Tariff (Schedule ReMAT) and standard Re-...
/*
this are needed for hide the google bar
*/
.goog-te-gadget .goog-te-combo {
display: inline-block;
width: 200px;
height: 36px;
padding: 6px 12px;
font-size: 16px;
line-height: 1.42857143;
color: #1b457e;
background-color: #fff;
background-image: none;
border: 1px solid #ccc;
border-radius: 4px;
-webkit-box-shadow: inset 0 1px 1px rgba(0,0,0,.075);
box-shadow: inset 0 1px 1px rgba(0,0,0,.075);
-webkit-transition: border-color ease-in-out .15s,box-shadow ease-in-out .15s;
-o-transition: border-color ease-in-out .15s,box-shadow ease-in-out .15s;
transition: border-color ease-in-out .15s,box-shadow ease-in-out .15s;
}
.goog-te-gadget img {
border: none !important;
padding: 0px !important;
margin: 0px !important;
}
.goog-te-banner-frame.skiptranslate {
display: none !important;
}
body {
top: 0px !important;
}
.goog-tooltip {
display: none !important;
}
.goog-tooltip:hover {
display:...
Verifying Your Identity
If your identity can’t be verified online, visit a branch office or other designated payment location to present identification and proof of your Social Security Number. Both are required. See below for authorized locations and acceptable forms of documentation.
Authorized locations
Not all offices or locations are authorized to verify identity.
Check our list before heading out.
Personal identification
We accept the following forms of identification:
Valid Picture Driver’s License (In or Out-of-State)
Valid Picture Identification Card (In or Out-of-State)
Passport
Military Identification Card
INS Identification Card
I-94 Identification Card
US Immigration Card
Student Identification Card
Employment Identification Badge
Credit Card with Picture
Credencial De Elector (Voters, ID)
Matricula Consular (An...
Thank you for your interest in ESA. An RHA contractor will contact you shortly. For more information on the ESA program, please visit sdge.com/ESA.
Docket No. ER23-454-000: TO5 Formula Depreciation Rate Change for Common Plant and Electric General Plant
Filing Date: November 17, 2022
1.12 MB
PDF
2022 Depreciation Filing
2022 Depreciation Filing
/*
this are needed for hide the google bar
*/
.goog-te-gadget .goog-te-combo {
display: inline-block;
width: 200px;
height: 36px;
padding: 6px 12px;
font-size: 16px;
line-height: 1.42857143;
color: #1b457e;
background-color: #fff;
background-image: none;
border: 1px solid #ccc;
border-radius: 4px;
-webkit-box-shadow: inset 0 1px 1px rgba(0,0,0,.075);
box-shadow: inset 0 1px 1px rgba(0,0,0,.075);
-webkit-transition: border-color ease-in-out .15s,box-shadow ease-in-out .15s;
-o-transition: border-color ease-in-out .15s,box-shadow ease-in-out .15s;
transition: border-color ease-in-out .15s,box-shadow ease-in-out .15s;
}
.goog-te-gadget img {
border: none !important;
padding: 0px !important;
margin: 0px !important;
}
.goog-te-banner-frame.skiptranslate {
display: none !important;
}
body {
top: 0px !important;
}
.goog-tooltip {
display: none !important;
}
.goog-tooltip:hover {
display:...
Del Mar Reconfiguration Project
Overview
The Del Mar Reconfiguration Project is part of our goal to improve the safety and reliability of the electric system. The project includes the reconfiguration of a transmission line in Del Mar, the removal of another line that stretches from Del Mar to Sorrento Valley, the undergrounding of two distribution circuits and the removal of 35 transmission poles from two area lagoons and a reserve.
The Del Mar Reconfiguration Project was approved by the California...