Power Your Drive for
State Parks and Beaches
EV Charging Infrastructure Program
In a continued effort to reduce greenhouse gas emissions (GHGs) and air pollution, SDG&E® has adopted a new program that will bring 74 EV chargers installed at approximately 12 sites. The two types of chargers that will be installed include: Level 2 (208-240 volt) chargers that can provide up to 10-20 miles of range per hour of charging and DC fast chargers (480 volt) that can provide about 50-60 miles per hour of charging. These chargers will accommodate existing EV drivers and encourage EV adoption.
-
Must be a state park or beach
-
Sites located in disadvantaged community (DAC) are preferred, but not required
-
Agree to enroll in eligible Time-of-Use (TOU) pricing plan
-
Operate & maintain charging equipment for at least 8 years
-
Site must include an appropriate location to deploy the charging equipment in a cost-effective manner
-
Must provide charging data for at least 5 years
-
Own or lease property where chargers are to be installed or be the customer of record associated with meter
-
Provide an easement, if required
-
Agree to program terms & conditions