Save Time and Money with the Renewable Meter Adapter for Your Solar System.

The renewable meter adapter (RMA) is a quick and easy way to start enjoying the benefits of your rooftop solar or other residential PV system. The RMA simplifies the interconnection process, enabling you to earn bill credits by making any excess energy you generate available for other customers to use–all without the need for costly, labor-intensive upgrades. The cost for the RMA is $1,326, making it a cost-effective solution for your interconnection needs.


 

The Main Benefits of Choosing an RMA

  • Avoid expensive electrical upgrades

  • Have it installed in as little as one hour

  • Save space in your service panel

  • Contractors won’t need to enter your service panel, enabling a safer interconnection

  • The RMA doesn’t alter your property or require additional common upgrade service repairs, like stucco repair, landscaping, or painting

  • Safer than other options as the RMA contains a main breaker for overcurrent protection

  • SDG&E will install, operate, and maintain the RMA throughout the life of the device

Technical Specifications

  • Underwriters Laboratories Inc. (UL) Listing

  • Meets National Electrical Code (NEC) requirements

  • Accommodates up to an 11.5kW photovoltaic system

  • Fits on electric meter panels rated up to 175 amps maximum

  • Provides 48 amps of overcurrent protection

  • Provides visible open PV fused disconnect

  • Requires physical clearances according to the RMA Clearances Guide

  • Meets utility service standards

  • U.S. Patent pending

How to Order

To request an RMA, you must first submit a solar/wind interconnection application in DIIS. We also require:

  • A Rule 2 Contract (FORM #106-1202signed by the customer of record, and

  • A photograph of the existing electrical panel

Fast-Track Your Application

Simply upload a clear, legible picture of the warning placard and meter within the same frame. We may be able to authorize your application without requiring a physical inspection, as soon as 24 hours from the date the local jurisdiction approves the permit. 