EcoChoice Interim Pool

Until new facilities can be built specifically to provide renewable energy for EcoChoiceSM customers, an interim pool of existing solar facilities will be used. This interim pool will be phased out when new, dedicated facilities are brought online.  

Solar Facilities Included in the SDG&E Interim Pool

Counterparty Name

Location

Commercial

Operation

Date (COD)

Size (MW)

Desert Green Solar, LLC

San Diego County, CA

10/31/2014

6.3

Sol Orchard San Diego 20 LLC

San Diego County, CA

12/31/2013

2

Sol Orchard San Diego 21 LLC

San Diego County, CA

12/31/2013

5

Sol Orchard San Diego 22 LLC

San Diego County, CA

12/31/2013

2.5

Sol Orchard San Diego 23 LLC

San Diego County, CA

12/31/2013

5

Maricopa West Solar PV LLC

Maricopa, CA

12/17/2015

20

Cascade Solar LLC

Sun Fair, CA

12/31/2013

18.5

TallBear Seville LLC

Imperial County, CA

12/30/2015

20

70SM1 8ME LLC (Calipatria)

Imperial County, CA

2/21/2016

20

The solar energy generated by the Interim Pool above what is needed to serve the EcoChoice program will be counted towards SDG&E’s Renewables Portfolio Standard (RPS) target.