EcoChoice Interim Pool
Until new facilities can be built specifically to provide renewable energy for EcoChoiceSM customers, an interim pool of existing solar facilities will be used. This interim pool will be phased out when new, dedicated facilities are brought online.
Solar Facilities Included in the SDG&E Interim Pool
Counterparty Name |
Location |
Commercial Operation Date (COD) |
Size (MW) |
---|---|---|---|
Desert Green Solar, LLC |
San Diego County, CA |
10/31/2014 |
6.3 |
Sol Orchard San Diego 20 LLC |
San Diego County, CA |
12/31/2013 |
2 |
Sol Orchard San Diego 21 LLC |
San Diego County, CA |
12/31/2013 |
5 |
Sol Orchard San Diego 22 LLC |
San Diego County, CA |
12/31/2013 |
2.5 |
Sol Orchard San Diego 23 LLC |
San Diego County, CA |
12/31/2013 |
5 |
Maricopa West Solar PV LLC |
Maricopa, CA |
12/17/2015 |
20 |
Cascade Solar LLC |
Sun Fair, CA |
12/31/2013 |
18.5 |
TallBear Seville LLC |
Imperial County, CA |
12/30/2015 |
20 |
70SM1 8ME LLC (Calipatria) |
Imperial County, CA |
2/21/2016 |
20 |
The solar energy generated by the Interim Pool above what is needed to serve the EcoChoice program will be counted towards SDG&E’s Renewables Portfolio Standard (RPS) target.