Displaying 1201 - 1210 of 1670 Search Results
ECO Substation Reconstruction and Modernization Project
The completed reconstruction and modernization of the Boulevard substation, one of the key components of our ECO Substation project has been completed. The entire project includes a new 58-acre state-of-the art substation in the East County community of Jacumba, the upgraded substation in Boulevard and a 14-mile transmission line connecting the two substations. Both the substation as well as the new transmission line was put into service on Dec. 29, 2014.
Construction began in May 2013 and the new 500kV substation in Jacumba was completed a year later in June 2014.
The ECO Substation project interconnects with the existing 500 kV Southwest Powerlink transmission line, strengthening this part of the transmission system. The project is a vital reliability addition and will improve service to…
South Orange County Reliability Enhancement (SOCRE) Project
Our mission is to provide our 3.7 million customers with clean, safe and reliable energy. To do this, we continue to modernize and upgrade existing substations and infrastructure, so you get the reliable energy you deserve. The SOCRE project improves electric reliability in South Orange County. The SOCRE project was approved on December 15, 2016, by the California Public Utilities Commission (CPUC). Construction on this project began in 2017 and is expected to be completed in 2024.
About the Project
The SOCRE project will increase the reliability and operational flexibility of SDG&E’s South Orange County 138-kilovolt (kV) system and reduce the risk of power outages. Aging electric infrastructure in South Orange County is being upgraded, including the Capistrano Substation in the City of…
سياسة الخصوصية
نلتزم في San Diego Gas and Electric ("SDG&E") بتبليغ زوّارنا حول كيفية استخدام المعلومات التي نجمعها على موقعنا الإلكتروني www.sdge.com ( "الموقع الإلكتروني "). باستخدامك لموقعنا الإلكترونيأو حصولك على منتجات أو خدمات منه، فإنك توافق على جمع واستخدام المعلومات بالطريقة التي تنص عليها هذه السياسة. إن لم تكن موافقاً على هذه السياسة، يرجى عدم استخدام هذا الموقع.
يرجى أخذ العلم بأن المواقع الإلكترونية الأخرى التي يمكن الدخول إليها عن طريق SDG&E تمتلك سياسات خصوصية وممارسات جمع واستخدام وكشف المعلومات الخاصة بها. لا تغطي سياسة الخصوصية هذه الممارسات الخاصة بالمعلومات للمواقع الإلكترونية الأخرى المرتبطة بموقع SDG&E.
المعلومات التي نجمعها وكيف نستخدمها
لكي نتمكن من توفير المنتجات والخدمات التي نقدمها إليك بشكل أفضل، فإن موقعنا الإلكتروني SDG&E يقوم بجمع نوعين من المعلومات: معلومات…
Power Your Drive EV Drivers
@media (min-width: 768px)
.tabs-block>.nav-tabs {
padding: 0px 0px;
overflow: hidden;
}
.tabs-block>.nav-tabs li {
width: 20%;
text-align: center;
}
div#builder-element-5c76cabb902b3 li {
width: 20%;
text-align: center;
}
.tabs-block>.nav-tabs li a:hover {
color: #FFFFFF;
background: #444444;
border-top: 10px solid #c0c0c0;
}
.tabs-block>.nav-tabs li.active a {
color: #305893;
background: #f3f3f3;
border: 0;
position: relative;
top: 0px;
border-top: 10px solid #305893;
padding: 36px 24px;
}
.tabs-block>.nav-tabs li a {
text-decoration: none;
cursor: pointer;
display: block;
//padding: 33px 10px;
background: #444444;
color: #c0c0c0;
border-radius: 0;
margin: 0;
font-family: "interstate-bold";
line-height: 1…
Apply for NEM - greater than 30kW
SDG&E has launched a new system for receiving applications called DIIS. If your company has previously been issued a company code by SDG&E, please select "I'm a Contractor and have a Company Code" on the registration page. Using a provided company code will allow you immediate access to the status of applications already submitted to SDG&E.
If your company has not been issued a company code and you have not submitted a Net Energy Metering application previously, select "I'm a Contractor and don't have a Company Code" on the registration page.
Please refer to the DIIS User Guide to begin the application process. For issues during this process you may contact us at 1-800-411-7343 or email [email protected].
Apply Now
(When enrolling, please select ‘DIIS’)…
Third Party Demand Response Providers
CPower
CPower is a demand-side energy management service provider who creates value through financial rewards for the customer and reliability for the grid. They provide custom solutions that helps customers save on energy costs, earn revenue through energy curtailment, support grid reliability and achieve sustainability goals. CPower has experience in serving customers across numerous industries including commercial, industrial, government, healthcare and education.
Provider Type: Commercial…
Community Choice Aggregators (CCAs)
Here are the CCAs currently operating within SDG&E’s service territory:
Solana Energy Alliance (SEA)
SEA is a public agency that offers 50 or 100% renewable energy to its customers. Participating communities include Solana Beach.
SEA has provided service to customers since June 2018.
For more information about SEA, call 858-720-4422 or visit Solana Energy Alliance.
CCA and SDG&E Rate Comparisons
Together with your CCA, we provide a Joint Rate Comparison of typical electric rates, average monthly charges and power sources.
723.85 KB
PDF
SDG&E/SDCP Joint Rate Comparison
SDG&E/SDCP Joint Rate Comparison
382.34 KB
PDF
SDG&E/CEA Joint Rate Comparison
SDG&E/CEA Joint Rate Comparison
Power Charge Indifference Adjustment (PCIA)
The Power Charge Indifference Adjustment (PCIA) is paid by all customers in SDG…