Displaying 1101 - 1110 of 1670 Search Results
Baseline Allowance
Baseline allowance is the monthly amount of energy you can use at the lowest tier pricing. If you use more than your allowance during your billing cycle, you’ll move up to the higher-cost tier pricing and beyond. This applies to customers who are on a Standard or Time-of-Use plan.
Did you know? SDG&E provides all customers with an additional 30% of baseline energy. This means you have an extra 30% of energy billed at the lowest price.
How Your Baseline Allowance is Determined
The following factors determine your baseline allowance:
The climate zone you...
Changes to your rates
As you’ve been hearing from us, California has changed the electric rate structure which means rates are now different for residential customers. The change to your bill varies depending on how much energy you use. Learn more about these rate changes
here.
Answer the questions below to find out how much your bill may change.
*Figures provided for illustrative purposes. Actual changes to your bill may vary.
Energy-saving tools and solutions
Visit
marketplace.sdge.com
to shop for energy-efficient products from light bulbs to appliances. You can also submit SDG&E® rebates for qualifying energy-saving products there and get reimbursed quickly.
Get a free Energy & Water Savings kit with three faucet aerators, an LED nightlight and a low-flow showerhead to help you save both...
View Windspeed Dashboard
Feedback form
Please use this form to provide feedback on SDGE.com. If you have a customer service issue please Contact Us.
If you have an electrical or gas emergency or if you suspect a gas leak, evacuate the building or area immediately and from a safe location call us at 1-800-411-7343.
Page Comments
Please tell us who you are
- None -customeremployee
Please enter your comments about this page
Click here to contact us.
Page Ratings
Content...
Accessing the Map
AS OF 1/1/19, ALL USERS WILL BE REQUIRED TO REAPPLY FOR ICA AND RAM MAP ACCESS AND OBTAIN A NEW PASSWORD AND LOGIN.
In order to view the map, you are required to register with SDG&E. Once registered, an email that contains a web link, username, password, and instructions to access and use the map will be sent to your email address.
Interconnection Map Registration Form
Instructions to access and use the map
Map
If you need assistance in viewing/registering for the interactive map, contact us via email or phone (858) 636-5581 during regular business hours (Mon-Fri, 7 a.m. to 4 p.m.
Integration Capacity Analysis (ICA) and Locational Benefit Analysis (LNBA) Map...
Renewable Auction Mechanism (RAM) Map
Distribution System Available Capacity:
Substation Location
This location is displayed as a 1 mile round symbol on the map. Placement of the cursor and clicking on the substation symbol causes a pop-up window to show “substation” and “available generation capacity."
Feeder Location
All feeders are shown as colored lines. Branches extending from the feeder are not shown. Placement of the cursor and clicking on the feeder symbol will bring up a pop-up window to show a “circuit number” and “available generation capacity."
Note: If the area you are looking for is not here, go to the Enhanced Integration Capacity Analysis page to register to use the EICA map.
Renewable Auction Mechanism (RAM) Map
Distribution System Available Capacity:
Substation Location
This location is displayed as a 1 mile round symbol on the map. Placement of the cursor and clicking on the substation symbol causes a pop-up window to show “substation” and “available generation capacity."
Feeder Location
All feeders are shown as colored lines. Branches extending from the feeder are not shown. Placement of the cursor and clicking on the feeder symbol will bring up a pop-up window to show a “circuit number” and “available generation capacity."
Accessing the map
AS OF 1/1/19, ALL USERS WILL BE REQUIRED TO REAPPLY FOR ICA AND RAM MAP ACCESS AND OBTAIN A NEW PASSWORD AND LOGIN.
67.00 KB...
CAISO Guidelines for Completing a GIP Interconnection Request
Interconnection Request (IR) form (GIP Appendix 1) (doc)
Generating Facility Data (Attachment A to GIP Appendix 1) (doc)
Generator Interconnection Procedures (GIP) (pdf)
Appendix Y of the CAISO Tariff
Generator Interconnection Process (GIP) Cluster Study Process Summary
Large Generator Interconnection Agreement
CAISO Tariff Appendix CC
GIP Cluster Study Timeline (pdf)
GIP Cluster Process Summary (pdf)
Generator Interconnection and Deliverability Allocation Procedures (GIDAP) Study Process Summary
GIDAP – CAISO Tariff Appendix DD
Large Generator Interconnection Agreement - CAISO Tariff Appendix EE
GIDAP Cluster 5 and Cluster 6 Study Timeline (xlsx)