NEM/NBT Documents

Everything you and your contractor will need to know to get you setup on our NEM/NBT program.

Processes & Guides

1.91 MB
PDF
NEM Application Process Guide
NEM Application Process Guide
219.11 KB
PDF
NEM Less than 30KW Interconnection Process (contractor install)
NEM Less than 30KW Interconnection Process (contractor install)
112.12 KB
PDF
NEM Less than 30KW Interconnection Process (self install)
NEM Less than 30KW Interconnection Process (self install)

NEM Systems Generating 30kW or Less

 When applying, use DIIS for the fastest and most accurate process. Submitting a paper-based or email-based application will require manual processing and will take longer time to process.

NEM Systems Generating 30kW or Less (Form 142-02774)

NBT Systems Generating 30kW or Less

When applying, use DIIS for the fastest and most accurate process. Submitting a paper-based or email-based application will require manual processing and will take longer time to process.

NBT - 30kW or less interconnection application (Form 142-02777)

NBT Systems Generating 30kW or More

When applying, use DIIS for the fastest and most accurate process. Submitting a paper-based or email-based application will require manual processing and will take longer time to process.

 

NBT - Interconnection application for Greater than 30kW (Form 142-02778)

NBT - Greater than 30kW Interconnection Agreement (Form 142-02779)

NEM/NBT Terms and Conditions

NEM/NBT Terms and Conditions (Form 142-02781)